查询
1 词典释义:
uat
时间: 2025-05-11 13:40:57

uat

双语例句
  • Confirm the baseline UAT tests.

    确认基线UAT测试。

  • Even if the future sit uat I will always be at your.

    即使未来风云万变,我始终会在你身边。

  • This class of environment includes the UAT, Pre-production and production environments.

    这一类型的环境包括UAT,生产前和生产环境。

  • For example, you can do it after functional test, or you can do it after UAT (user acceptance test).

    比如,你可以在功能测试之后做评估,或者在UAT(用户接受测试)后做。

  • As you change code, unit test, and perform UAT, you should identify bottlenecks and implement changes as needed.

    当您改变代码、单元测试并执行UAT时,应该识别瓶颈并根据需要进行改进。

  • Leika - Thorn's UAT electronic surveillance equipment, the company Thorn 675 (2) electronic jamming planes.

    雷卡·索恩公司的UAT电子侦察设备,索恩公司的675(2)型电子干扰机。

  • UAT is a very formal end-user testing procedure; it is your customer's formal approval of your project deliverables.

    UAT是一个极其正式的测试过程;它是客户对于您项目可交付性的正式批准。

  • UAT - User Acceptance test including functional test that would validate that the appropriate business capabilities are present.

    UAT——用户验收测试,包括功能测试,它会验证是否存在适当的业务功能。

  • The net effect was that when this work was complete our response times for production bug fixes or UAT fixes improved remarkably.

    净效应就是当工作结束了,我们对产品bug修正或者UAT修正的反应时间得到了很明显的提高。

  • Quality Assurance (QA), User Acceptance testing (uat), performance, and stress testing can all create issues that need to be evaluated.

    质量保证(Quality Assurance, QA)、用户接受度测试(User Acceptance Testing, UAT)、性能和压力测试都可能带来需要进行评估的问题。

  • For Singtel, most of the circuits are up-billed as the same day of CPC UAT, some special cases, may bill it after the router is installed.

    新加坡电信、电路的大部分是向上-誉为中国翻译公司党uat,某些特殊的情况下,同一天可能比尔路由器安装之后。

  • During uat , end users will have to operate the system and will have to accept the training material before the deployment of the increment.

    在用户测试期间,终端用户将须在设置递增交付成品前操作该系统和收取培训材料。

  • Before deploying all or part of the solution deliverables to the customer's production environment, you should perform a User Acceptance Test (UAT).

    在向客户生产环境部署所有或部分解决方案可交付性之前,您应该执行用户接受度测试(User Acceptance Test, UAT)。

  • User Acceptance Testing (UAT) seems to always be done but it is normally only a handful of chosen people and not the full complement of users within the business.

    用户验收测试(UT)看起来总是能完成,但是他是面对一小撮选定的用户,而不是公司内所有的用户。

  • This includes release planning, iteration planning, iteration kickoff, requirements gathering, UAT at the end of an iteration and project retrospectives at the end of each iteration.

    这包括发布计划、迭代计划、迭代kickoff会议、需求收集,每个迭代末尾的UAT (user accessence Test)以及项目回顾。

  • The UAT process might require a significant amount of time from your customer's end users, because you might need to educate them first before they can start UAT. This plan should include

    UAT 过程可能需要花费客户的终端用户的大量时间,因为在他们可以启动 UAT 之前,您可能首先需要对他们进行培训。