查询
1 词典释义:
mining engineering
时间: 2025-10-21 08:23:00

n.采矿工程

双语例句
  • It has certain significance in mining engineering construction.

    对指导采掘工程施工具有一定的意义。

  • It analysed the problem system on the optimal design in mining engineering.

    最后讨论了矿山工程最优设计的问题系统。

  • The roadway excavation and supporting are crucial techniques in mining engineering.

    巷道掘进与支护是采矿工程的技术关键。

  • Rockburst tendency is one of the important indices for the safety evaluation of deep mining engineering.

    岩爆倾向性是评价地层深部工程安全性的一个十分重要的指标之一。

  • Rock bolt, as an effective rocky reinforcement measure, is widely applied in civil and mining engineering.

    锚杆作为岩土工程的重要支护手段,被广泛应用于岩土加固工程中。

  • During the mineral resource and reserve checking, the surveying data of mining engineering shall be checked.

    在矿山资源储量核查中,应对其采矿工程测量资料进行检测。

  • On this basis, the article proposes the train of thoughts of the professional teaching of mining engineering.

    在此基础上确定了该项目研究的内容、目标、教改思路及课程体系。

  • Many problems will be faced in mining Engineering due to the complexity of mining procedure and geology conditions.

    由于矿山地质条件复杂、采矿生产过程环节多而且采矿工艺复杂,采矿工程中通常会遇到许多不确定的问题。

  • For this, the course 'special subject lecture' was set up for coal mining engineering profession in our university.

    辽宁工程技术大学采矿工程专业开设了“专题讲演”课程。

  • Research indicates that it is provide new thought and method for the analyze of mining engineering structure reliability.

    研究表明,这对矿山工程的可靠性分析提供了新的思路和方法。

  • Finally, we simply discuss the suitable ranges and the prospects for the application of fuzzy mathematics in mining engineering.

    最后对模糊数学在采矿工程中应用的范围与前景做了简单地阐述。

  • Based on mining engineering actualities, the paPer puts forward a boundary element numerical model for consolidated fill mining.

    本文根据采矿工程实际,提出了胶结充填开采的边界元数值模型。

  • Evaluation of reserves is the heart of geological reliability evaluation of deposit, and it is the key step of mining engineering.

    储量评价是矿床地质可靠性评价的核心内容,也是采矿工程中的关键环节。

  • By using drilling in pit, ore reserve classification is increased, risks of underground mining engineering are reduced and avoided.

    主要阐述了矿区通过实施坑内钻探,提高储量级别,降低和避免井下采矿工程风险,节约了成本,增加了效益。

  • Some problems about mining engineering from open-pit to underground mine are discussed, which will provide reference for the future work.

    对永平铜矿露天转地下开采工程有关问题进行了探讨,为下一步工作提供参考。

  • Mechanial theory has been applied in many aspects of mining engineering, but many new mechanical problems appear continuously in practice.

    力学理论已在采矿工程中许多方面得到应用,但在实践中还不断出现新的力学问题。

  • In 1950, mining engineering and technical personnel Fengfeng Bureau of only 79 people, with more than engineers, the title of only 4 people.

    1950年,峰峰局采矿工程技术人员仅有79人,具有工程师以上职称的仅4人。

  • The problems of rock mechanics caused by the deep mining engineering are the focuses in the fields of mining engineering and rock mechanics.

    深部开采工程中产生的岩石力学问题成为目前国内外采矿及岩石力学界研究的焦点。

  • The management information system of mine enterprise has close relationship with mining engineering, mine management and computer technology.

    矿山企业信息系统与矿山工程、矿山管理、计算机技术密切相关。

  • Through to acoustic emission technology understanding, in the light of the mining engineering key stratum theory, applies it in overhead mining.

    通过对声发射技术的理解,结合采矿工程中关键层理论,将其应用到蹬空开采中。

  • The roof in working areas is simplified as rock beam, the maximum tensile stress and limited span of rock beam are important in mining engineering.

    将采场顶板简化为岩梁模型,岩梁的最大拉应力及其极限跨距是采矿工程涉及到的两个重要参数。

  • With the finite element method of material description, the rock mass in underground and opencast united mining engineering was simulated and analyzed.

    采用物质描述增量有限元方法,对露天与地下联合开采工程岩体进行了数值模拟分析。

  • In addition to charts and tables which are meaningful to control surface subsidence and rock pressure in mining engineering, examples are also provided.

    文中除给出对采矿工程中控制地表沉陷与矿山压力有意义的图表外,还提供了几个实例。

  • And taking roadway protection without coal-pillars in mining engineering courses as a case, the paper described in detail the operation of this process.

    并以矿业工程课程中的无煤柱护巷问题作为案例对象,详细阐述了此流程的运行过程。

  • Landslides cause a heavy loss in the process of construction of water conservancy and power project, railway and highway project, mining engineering etc.

    滑坡灾害给建筑、水利、铁路、公路、矿山等带来了巨大的损失。

  • Now the mining engineering problem has been not just the mining issues, but also to pay attention to stability and surrounding rock strata control problems.

    现在的采矿工程已不仅是开采问题,而且还要注意围岩稳定性和岩层控制。

  • Seepage control in karstic rock mass is one of the most important problems in hydroelectric engineering and mining engineering as well as traffic engineering.

    溶蚀岩层的防渗是我国水电工程、矿山工程和交通工程的重要难题之一。

  • The geological condition is quite complicated in mining engineering belong to Jinchuan Corporation, and out of control of blasting may cause severe consequence.

    金川公司所属矿山工程地质条件十分复杂,爆破失控会带来严重后果。

  • In mining engineering, strata models are often simulated by similar material simulation model, rock bending deformation and fracture damage is the serious problem.

    而在采矿工程中,相似材料模拟的往往是层状模型,岩层的弯曲变形和断裂破坏是关键问题。